• Short Summary

    An electrical transmission line is being laid through the Central Tyan-Shan Mountains. Metal supports weighing?

  • Description

    An electrical transmission line is being laid through the Central Tyan-Shan Mountains. Metal supports weighing many tons are to installed on the Kumbel-Ata Range. The work is carried out in severe winter conditions at an altitude of 3600 meters. The new electrical transmission line, the highest in the country, will be 108 km. long. It will bring electricity to the distant areas of Kirghizia.

  • Tags

  • Data

    Film ID:
    VLVA6JQITWBQXH7JY23KINJ4DCUFE
    Media URN:
    VLVA6JQITWBQXH7JY23KINJ4DCUFE
    Group:
    Reuters - Source to be Verified
    Archive:
    Reuters
    Issue Date:
    01/01/1968
    Sound:
    Unknown
    HD Format:
    Available on request
    Stock:
    Black & White
    Duration:
    00:00:54:00
    Time in/Out:
    /
    Canister:
    N/A

Comments (0)

We always welcome comments and more information about our films.
All posts are reactively checked. Libellous and abusive comments are forbidden.

Add your comment